S.No | Name of The Industry | Day of Visit | No .of Students Benefited | Related Course of Study |
---|---|---|---|---|
Academic Year 2022-2023 |
||||
S.No | Name of the Industry | Day of Visit | No Of Student Beefited | Related Course of Study |
1 | Dr.N.G.P. Arts College Building Construction | 26.03.2022 | 38 | Strength of Materials Design of Steel Structural Elements |
2 | Isha Yoga Centre & Construction Site | 28.04.2022 | 35 | Construction techniques & Practices Maintenances, Repair & Rehabilitation of Structures |
3 | Desai Homes project, Edappally, Kochi | 25.05.2022 | 39 | Concrete Technology Structural Analysis Ground Improvement Techniques |
4 | Mosco Tea Factory, Vagemon | 25.05.2022 | ||
Academic Year 2019-2020 |
||||
1. | Aliyar Dam | 06.07.2019 | 40 |
Applied Hydraulic Engineering, Fluid Mechanics. |
2. | Main Block, Dr.N.G.P Institute of Technology , Coimbatore. | 10.07.2019 | 42 |
Estimation of Reinforcement |
3. | Public Works Department, Coimbatore | 03.08.2019 | 34 |
Pre stress Bridge Construction |
4. | Metro Rail project, Ashirwad Ready Mix, Mysore Maharaj Palace. | 15/08/2019, 16/08/2019, 17/08/2019. | 40 |
Execution progress of Metro rail project |
5. | Canteen Block Construction, B.Ed College, Dr.N.G.P Institute of Technology, Coimbatore. | 19/08/2019 | 36 |
Design of Reinforced Concrete structures |
6. | Canteen Block Construction, B.Ed College, Dr.N.G.P Institute of Technology, Coimbatore. | 22/08/2019 | 30 |
Design of Reinforced Concrete structures |
7. | B.Ed College Block, Dr.N.G.P Institute of Technology, Coimbatore. | 27/08/2019 | 36 |
Construction Materials |
8. | North Block Construction, B.Ed College, Dr.N.G.P Institute of Technology , Coimbatore. | 09/09/2019 | 50 |
Construction Materials |
9. | Pillur Water Treatment Plant | 16/09/2019 | 42 |
Water Supply Engineering |
10. | Proposed KMCH-Ladies Hostel Building | 20/09/2019 | 27 |
Design of Reinforced Concrete structures |
11. | Proposed KMCH-Ladies Hostel Building | 24/09/2019 | 8 |
Design of Reinforced Concrete structures. |
12. | Om-Muruga Ready Mix And Blue Metals | 28/09/2019 | 19 |
Concrete Tehnology |
Academic Year 2018-2019 |
||||
01. | KMCH Nursing College Visit | 28.07.2018 | 10 |
Electrical and Plumbing works, Plastering works |
02.. | Sat Land Survey Institute, Coimbatore | 28.07.2018 | 48 |
Total Station demo |
03. | Kef Katerra, Krishnagiri | 08/09/2018 | 40 |
Prefacbricated Structures |
04. | KMCH Hospital Building | 12/12/2018 | 34 |
Reinforced Concrete Structures |
05. | Kef Katerra, Krishnagiri | 11/01/2019 | 37 |
Prefacbricated Structures |
06. | Mettupalayam Railway Station | 19/01/2019 | 49 |
Railway & Habour Engineering |
07. | BavaniSagar Dam | 23/02/2019 | 40 |
Irrigation Engineering Applied Hydraulic Structures |
08. | RK Infra Pvt Ltd, Mysore. SivapuraBuiders & Earthmovers, Coorg | 14,15&16/ Feb/2019 | 48 |
Construction Techniques Equipment & practice, Reinforced Concrete Structures, Highway Engineering |
09. | SR Constructions | 22&23/Feb 2019 | 47 |
Reinforced Concrete Structures |
10. | KMCH Nursing College | 26/11/18 | 40 |
Reinforced Concrete Structures, Construction Techniques Equipment & practice, |
11. | Chettinad Builders ,Coimbatore | 5/1/19 | 40 |
Construction Techniques Equipment & practice, Reinforced Concrete Structures |
Academic Year 2017-2018 |
||||
01. | Dr.N.G.P.IT NEW BUILDING | 13.07.2017 | 63 |
cranks, one-way slabs, and two-way slabs |
02. | Teemage Precast In, Kangeyam | 05.08.2017 | 25 |
precast concrete stuctures |
03. | RR ALL SEASONS, COIMBATORE | 30.08.2017 | 63 |
Practical considerations and the differences between the one way slab and two way slab, singly reinforced & doubly reinforced beams, et |
04. | ALIYAR DAM, COIMBATORE | 08.09.2017 | 60 |
Contour Canal, Turbine, Generator |
05. | Dr. N.G.P College of Nursing block and Dr. N.G.P. College of Physiotherapy and Occupational Therapy block | 22.07.2017 | 52 |
One-way slab Construction |
06. | Pillur Water Supply Scheme, Velliangadu - Coimbatore | 06.09.2017 | 60 |
Irrigation structures |
07. | INCA BRICKS COIMBATORE | 06.01.2018 | 52 |
Manufacturing of bricks |
08. | P R Ready mix India Pvt.Ltd., Coimbatore | 03.02.2018 | 52 |
Concrete Mix Plant Capacity,Testing Unit ofConcrete,Compressive Strength of Concrete, Curing Tank for Curing of Concrete,Transit Mixer, Material used in Concrete,Design parameters, etc. |
09. | Dr.N.G.P COLLEGE OF EDUCATION | 24.02.2018 | 63 |
Slab, Beam and Column reinforcement |
10. | KEF infra one industrial park - Krishnagiri | 24.02.2018 | 59 |
Precast concrete elements |
11. | Dr.N.G.P.IT NEW BUILDING | 01.03.2018 | 63 |
Slab, types of slab |
12. | Mettupalayam Railway Station | 03.03.2018 | 63 |
Rails, sleeper, ballast |
Academic Year 2016-2017 |
||||
01. | Kerala Engineering Research Institute, Peechi | 18.02.2017 | 63 |
Material used to construct the dam was by RRM (Random Rubble Masonry) |
02. | Dr.N.G.P.IT NEW BUILDING | 27.02.2017 | 59 |
Slab, Beam and Column Reinforcement |
03. | Dr.N.G.P.IT NEW BUILDING | 01.03.2017 | 61 |
process of placing RMC concrete with blower and sequential progress involved before and after placing |
04. | Chettinad Cements Corporation Limited, Karur | 31.03.2017 | 61 |
Dry process of manufacturing of cement |
Academic Year 2015-2016 |
||||
01. | Siruvani Water Treatment Plant, Coimbatore | 23.09.2015 | 59 |
Process of treating water |
02. | Chettinad Cement Corporation Limted | 11.03.2016 | 60 |
Manufacturing of cement |
03. | ISHA TEMPLE, COIMBATORE | 01.09.2016 | 63 |
Dome construction |
04. | SALEM STEEL PLANT | 20.08.2016 | 59 |
Manufacturing of steel |
Academic Year 2014-2015 |
||||
01. | AV properties (INDIA) private limited, Coimbatore | 04.07.2014 | 55 |
Slab, Beam and Column reinforcement |
02. | RMC Ready mix (India), Division of Prism Cement Limited, Coimbatore | 19.07.2014 | II Year -55 |
Process of preparing ready mix concrete |
03. | RMC Readymix (India), Division of Prism Cement Limited, Coimbatore | 08.08.2014 | 50 |
process of preparing ready mix concrete |